by Staff | Oct 26, 2009 | Control Systems, CSI, Motion Control
THE MYSTERY A quarry providing limestone for construction and landscaping called ACES because their rock saw wasn’t cutting stone to the proper width. The saw operator had to subtract 1?8” from each cut to arrive at the proper stone width. THE CLUES The operator said...
by Staff | Oct 21, 2009 | Control Systems, CSI, Motion Control, Wiring and Electricity
THE MYSTERY A local chip maker called because their tortilla press would run fine for awhile, but then during the middle of a cycle the press would come down and not return to the up position. Cycling power to the machine it would resume operation sometimes for hours...
by Staff Writer | Oct 8, 2009 | Control Systems, CSI, Municipal Water, Programming
THE MYSTERY A municipal water plant was stuck with an unresponsive system of 28 PLCs and an AWOL dealer. The case of the obsolete PLCs. Every vendor the client talked to insisted a whole new system was the only way to get the plant back up to speed again. THE CLUES...
by Staff Writer | Oct 7, 2009 | CSI, Furnaces and Ovens
THE MYSTERY An avionics supplier had been wrestling with a jerky, stubborn, catching oven door for years. All attempts at repair had failed. The case of the jerky oven door. THE CLUES Upon close investigation, the ACES CSI on the scene discovered that the gear box was...